Value: €515,000
Client: Hibernia Reit
Project Manager: W K Nowlan
Project Engineer:Cora Consulting Engineers
Quantity Surveyor: Mulcahy McDonagh
The project fronting onto the busy Sir John Rogerson’s Quay included the demolition of the existing Windmill Lane studio’s along with three warehouses, two of which had asbestos roof sheeting. Also included was the demolition of a six-story building along a the heavily trafficked Lime Street.
The project fronting onto the busy Sir John Rogerson’s Quay included the demolition of the existing Windmill Lane studio’s along with three warehouses, two of which had asbestos roof sheeting. Also included was the demolition of a six-story building along a the heavily trafficked Lime Street.
As a number of the adjoining neighbouring listed buildings gables were exposed, we were responsible for designing and installing a temporary supporting system. In addition, these gables were also temporarily weathered. Throughout the works an environmental monitoring system was on site to measure and control noise, vibration and dust.
The developer requested a LEED accreditation on the building and thereby a waste management system was installed to control the traceability of all waste.